|
楼主 |
发表于 2009-10-31 11:13:14
|
显示全部楼层
5On Sept. 10, 2009, NASA and industry engineers lit up the Utah sky with the initial full-scale, full-duration test firing of the first stage motor for the Ares I rocket. The 154-foot solid rocket motor produced heat two-thirds the temperature of the sun and its 12-foot-diameter cylinder delivered 3.6 million pounds of thrust. (NASA, Walt Lindblom) #
6At the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida, hardware that will be used in the launch of the Ares I-X rocket is offloaded from a C-5 aircraft. The hardware consists of a precisely machined, full-scale simulator crew module and launch abort system to form the tip of NASA's Ares I-X rocket. (NASA/Jack Pfaller) #
7A-3 Test Stand Construction at NASA's Stennis Space Center in in Hancock County, Mississippi. Nine water, isopropyl alcohol (IPA) and liquid oxygen (LOX) tanks have been delivered and installed, with five more water tanks scheduled to arrive in upcoming weeks. The two IPA tanks shown on the left and the three LOX tanks shown on the right are 35,000 gallons each. The four water tanks in the center are 39,000 gallons each. All 14 of the tanks will be used by the chemical steam generators units that will be installed on the A-3 stand for creating simulated altitudes of up to 100,000 feet, a testing environment for Constellation, initially to validate the performance of the J2-X engine for the upper stage of the new Ares I launch vehicle. (NASA/SSC) #
8In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the Ares I-X upper stage simulator service module/service adapter (left, center) has been installed on a stand. Other segments are placed and stacked on the floor around it. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. (NASA/Kim Shiflett) # |
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?注册
×
|